Why Industrial Control Systems Fail — And How Bently Nevada Helps Fix It

PLC and DCS

Why Industrial Control Systems Fail — And How Bently Nevada Helps Fix It

Why Industrial Control Systems Fail — And How Bently Nevada Helps Fix It

Discover the root causes of ICS failures and learn how Bently Nevada improves reliability with predictive monitoring.

Understanding ICS Failure Risks

Industrial systems run 24/7 in harsh environments.

65% of ICS failures result from aging hardware and environmental stress.

Heat and vibration reduce component lifespan by up to 50%.

Continuous monitoring helps detect early signs of wear.

Top ICS Failure Causes

  • Power surges cause 30% of unplanned shutdowns
  • Improper grounding leads to signal noise and data corruption
  • Loose wiring accounts for 25% of short-circuits
  • Manual inspection often misses early-stage issues

Why Reactive Maintenance Fails

Scheduled checks don’t reveal hidden faults.

Manual inspections are 70% less accurate than sensor-based systems.

$260,000/hour can be lost due to downtime.

Preventive strategies often come too late.

Bently Nevada Predictive Monitoring in Action

  • Real-time monitoring of 90+ parameters using vibration and temperature sensors
  • 3500 Series platform enables high-frequency sampling
  • Clients report up to 60% fewer outages
  • Maintenance costs drop by 30% on average

Smart Integration with PLC & DCS

Bently Nevada integrates with:

  • Siemens, ABB, Rockwell PLCs
  • Supports Modbus, OPC UA, and Ethernet/IP protocols
  • Improves response time by 35%
  • Visual data dashboards enhance operator awareness

Maintenance Method Comparison

FeatureTraditionalBently Nevada
ApproachReactivePredictive
Downtime RiskHighLow
ROIUncertain300%+
Maintenance FrequencyFixed IntervalsCondition-Based

Proven Benefits & Long-Term Value

Clients see 40–70% fewer shutdowns in the first year.

Unplanned maintenance calls drop by 25%.

System lifespan increases, downtime costs decrease, and efficiency improves site-wide.

Final Thought: Shift from Reactive to Proactive

Predictive monitoring is no longer optional—it’s essential.

Bently Nevada provides proven tools for reliability-centered operations.

Investing now prevents failure, protects assets, and ensures uptime.

Check below popular items for more information in Control Nexus.

330702-00-10-10-12-05330702-00-24-90-11-05330702-00-10-10-12-00
330702-00-24-10-12-00330702-00-24-50-11-001756-IB32/B
1756-CNB/B1756-H4FXOF2F1756-CN2RXT
1756-L731756-L6322D-B2P3N104
IC697BEM763IC697BEM764IC697CMM711
IC697CMM741IC697CMM742IC697MDL241
IC697MDL240IC697MDL250IC697MDL251
IC697MDL252IC697MDL253IC697MDL254
22D-D010H20422D-D010N10422D-D012F104
22D-D012H20422D-D012N10422D-D017F104
22D-D017H20422D-D017N10422D-D024F104
22D-D024H20422D-D024N10422D-D1P4F104
22D-D1P4H20422D-D1P4N10422D-D2P3F104
22D-D2P3H20422D-D2P3N10422D-D4P0F104

LEAVE A COMMENT

Your email address will not be published. Required fields are marked *